Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?


A) Pegging
B) Safety stock
C) Increased order sizes
D) Safety time
E) Low-level coding

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

The three basic inputs of MRP are: 1)the bill of material; 2)inventory on hand,open orders and lead times; and 3)planned order releases.

A) True
B) False

Correct Answer

verifed

verified

Which action would not be undertaken if capacity requirements planning (CRP) indicate one or more work stations are projected to be under loaded or over loaded?


A) Shifting some orders to adjacent periods.
B) Transferring employees from other areas.
C) Scheduling overtime.
D) Revise the MPS and MRP.
E) Re-run the load report using different values.

F) C) and D)
G) A) and E)

Correct Answer

verifed

verified

The development and application of MRP is primarily associated with two developments: (1) managers recognizing the need to differentiate between independent and dependent demand,and (2) ___________.


A) increased reliance on computers for record keeping
B) development of the EOQ model
C) the need for inventory control systems
D) the emergence of ERP systems
E) accounting systems

F) C) and D)
G) A) and C)

Correct Answer

verifed

verified

Which of the following are not primary reports provided by MRP systems?


A) Planned order releases
B) Immediate order releases
C) Demand history reports
D) Changes to open orders

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

The master production schedule (MPS)states which end items are to be produced.

A) True
B) False

Correct Answer

verifed

verified

The MRP approach that immediately updates only those records directly affected by a change is referred to as a(n) :


A) regenerative MRP.
B) batch-type MRP.
C) Plossl-Wright system.
D) net-change MRP.
E) gross-change MRP.

F) C) and E)
G) B) and D)

Correct Answer

verifed

verified

MRP usually involves inventory items that have independent demand.

A) True
B) False

Correct Answer

verifed

verified

Fixed-interval ordering in MRP places orders that cover a predetermined number of periods.

A) True
B) False

Correct Answer

verifed

verified

MRP II involves an expanded approach to production planning and scheduling than MRP.

A) True
B) False

Correct Answer

verifed

verified

The emergence of ERP systems was primarily because they are less complex to use than MRP systems.

A) True
B) False

Correct Answer

verifed

verified

The master production schedule (MPS)states which product components are to be produced.

A) True
B) False

Correct Answer

verifed

verified

A report that compares known and expected future capacity requirements with projected available capacity is a:


A) master production schedule.
B) bill of material report.
C) inventory status report.
D) MRP schedule.
E) load report.

F) A) and E)
G) D) and E)

Correct Answer

verifed

verified

Budget overruns when implementing ERP systems are typically caused by:


A) high equipment costs.
B) high capital interest charges.
C) the cost of the ERP software
D) high training costs
E) the software supports the companies business processes

F) B) and C)
G) B) and E)

Correct Answer

verifed

verified

In MRP processing the difference between a planned-order release and the planned-order receipt is:


A) level of safety stock.
B) scheduled receipts of open orders.
C) timing as per the lead time.
D) a one is a forecast and the other is actual.
E) the level of net requirements.

F) D) and E)
G) C) and E)

Correct Answer

verifed

verified

The input used in MRP that lists the assemblies,subassemblies,parts,and raw materials needed to produce one unit of finished product is the:


A) master production schedule.
B) bill of material.
C) inventory-records.
D) assembly-time chart.
E) net-requirements chart.

F) B) and C)
G) A) and E)

Correct Answer

verifed

verified

Dependent demand is derived demand.

A) True
B) False

Correct Answer

verifed

verified

The following is a list of components required to produce one unit of end item P: P: 2 A's,3 B's,3 C's A: 5 M's,2 R's B: 1 D,3 N's. C: 1 T,4 N's M: 1 N Determine the number of N's that will be needed to make 60 P's in each of these cases: (i)There are currently 10 P's on hand. (ii)On-hand inventory consists of 15 P's,10A's,20 B's,10 C's,100 N's,300 T's,and 200 M's.

Correct Answer

verifed

verified

(i) blured image_TB6896_00 (ii)45 P's needed.A leg: ...

View Answer

Given an order cost of $100,a,per period holding cost of $.50,and the following requirements schedule: Given an order cost of $100,a,per period holding cost of $.50,and the following requirements schedule:   For which period will the second order be submitted using the part period lot sizing method? A) Period 2 B) Period 3 C) Period 4 D) Period 5 E) Period 6 For which period will the second order be submitted using the part period lot sizing method?


A) Period 2
B) Period 3
C) Period 4
D) Period 5
E) Period 6

F) A) and C)
G) A) and E)

Correct Answer

verifed

verified

For a given component in an MRP plan,under lot-for-lot ordering,planned order sizes are equal to net requirements.

A) True