In MRP, the gross requirements of a given component part are calculated directly from


A) net requirements + projected on-hand inventory.
B) gross requirements of the immediate parent.
C) planned order releases of the end item.
D) net requirements of the end item.
E) planned order releases of the immediate parent.

F) A) and E)
G) None of the above

Correct Answer

verifed

verified

_______ is choosing how many to order or make each time an order is planned.


A) Quantity determination
B) Package sizing
C) Lot sizing
D) Grouping
E) Aggregation

F) None of the above
G) A) and E)

Correct Answer

verifed

verified

The multiplication process used by MRP to determine lower-level requirements is called


A) time-phasing.
B) pegging.
C) netting.
D) projecting.
E) exploding.

F) C) and D)
G) C) and E)

Correct Answer

verifed

verified

Lot-for-lot ordering in MRP minimizes holding costs for parts that are carried over to other periods.

A) True
B) False

Correct Answer

verifed

verified

The MRP input storing information on the status of each item by time period (e.g., scheduled receipts, lead time, lot size) is the


A) master production schedule.
B) bill of materials.
C) inventory records.
D) assembly time chart.
E) net requirements chart.

F) B) and E)
G) A) and D)

Correct Answer

verifed

verified